Constanţa travel icon will be restored in two years


casino, constanta, seagulls

The Government has re-approved the technical and economic indicators for the consolidation and restoration of the Constanta Casino, with the National Investment Company. Their total value is over 111 million lei and the duration is estimated at 30 months.

The Romanian government reappointed the technical and economic indicators for strengthening and restoring the Constanta Casino, the ministry of Regional Development and Public Administration announced on Wednesday.

The estimated duration of the project is 30 months (3 months design phase and 27 months execution).

The works will be carried out by the Ministry of Regional Development and Public Administration (MDRAP) through the National Investment Company (CNI) and the total estimated value of the investment is 111,553,449.35 lei (VAT included).

With regard to the documentation initially endorsed in 2015, the main changes concern:

• Functional reconfiguration and adaptation of the interior and exterior spaces to the new functions proposed by the design theme, representative of the social-cultural life of the city and for an “A” category monument of exceptional architectural and historical value;

• adapting architectural, structural and installation projects to the new proposed functions, taking into account the updating of the expertise and studies at this design phase;

• revision of architectural and artistic components documentation (mural painting, stucco-marble, polychrome stucco, metal and stained glass) to adequately treat the degradation occurring between 2014 and 2018;

• updating the design norms and the legislation in the field, “the Ministry of Development specifies.

“Today we have committed ourselves to being rehabilitated by this emblematic objective of Romania and I am convinced that we will be able to accomplish this project, which is highly expected by all Romanians,” said Deputy Prime Minister Vasile Daniel Suciu.

Thus, consolidation and restoration works (building S + P + 1E + M, partial bridge and access ramp to the basement) and the exterior ones (terraced platform rehabilitation, utilities networks, defense wall and railing) are proposed.

The main changes to the documentation endorsed in 2015 refer to: functional reconfiguration and adaptation of interior and exterior spaces to the new functions proposed by the design theme, representative of the social and cultural life of the city and of an architectural and architectural monument of “A” category exceptional history; adapting architectural, structural and installation projects to the new proposed functions, taking into account the updating of the expertise and studies at this design phase;review of architectural and artistic components (mural, stucco-marble, polychromatic stucco, metal and stained glass) to adequately address the degradation occurring between 2014 and 2018; updating the design norms and legislation in the field.

Following the consolidation and restoration work, the casino will be relayed to the public circuit and the most important Art Nouveau building will be highlighted.

The casino will host cultural events, symposiums, exhibitions, a 200-seat multipurpose hall and a 150-seat festive hall.

The Constanta travel icon passed almost four years ago from the municipality to the National Investment Company to be restored, and since then the three organized auctions have been challenged and finally canceled.

The building entered last year’s list of the seven most endangered sites in Europe.

Partner Posts

ABANDONED Beach Casino in ROMANIA

Constanta Romania With one of the coolest Abandoned Hotel Casino right up on the beach front and one of the most beautiful beaches in the country this city is ...

Loading…

Be the first to comment

Leave a Reply

Win a 3-night European city break! Expires on June 30 2019!!!
+
ALOT - A Lot Of Trips

FREE
VIEW